top of page
Why “Red Line” Survey Scopes Can Miss Live Through Services - A PAS:128 Utility Survey Case Study
Introduction Defining a strict red line boundary is common when commissioning a utility survey. However, real‑world underground infrastructure does not always respect those boundaries. This case study demonstrates a practical example of how live “through” services can remain undetected when survey extents are too narrowly defined, even within a PAS 128 compliant survey framework. Background and Context No two sites are the same when it comes to surveying and mapping utilities

Oliver Firth
Feb 264 min read
bottom of page
